This international project is being carried out jointly with ecisa in the city of Oran, Argelia.
 The goal of this project is to correct the discharge of wastewater into the Mediterranean Sea by collecting and redirecting it to the treatment plant through the pumping stations of Pecherie, Centreville and Gambetta.
 The work consisted of the electrical installation of transformer centres, soundproof generators, submersible pumps, wall and channel gates, mechanical grille cleaning, conveyor screws, lifting and deodorising equipment, compressors, optic fiber wires and the control and automation of all this equipment. All this is integrated into a SCADA system, allowing remote control of the equipment and modification of its process values in real time.
 
This project is of large size hidraulic and control, allows us to be pioneer in the technological progress in Algeria at water treatment plants.
 From the principal station, they can control the three principal pumping with the SCADA, it allows change variables with a range established.
 Thanks to the safety features implemented within the automation system programmed by our technicians, it will be possible to avoid errors made by the operators inside the station.
 All this is possible because of the system of signals on which the pumps depend, it makes the stations work in cascade and it has all a good operation.